Project Background
The printing house aimed to build a smart and scalable EV charging infrastructure for employees and customers that serves both now and in the future. The goal was to implement a cost-effective charging solution that allows easy management and enables simultaneous charging for two vehicles. The goal was to make everyday life smoother and support the company’s sustainable development goals.
INCH Duo Meets the Printing House’s Needs
To prepare for future requirements, the printing house wanted to establish a suitable charging infrastructure from the start, as new regulations increasingly require properties to install EV charging stations. The wishes were met by installing an INCH Duo charging station in the ground of the printing house’s parking lot and a charging rediness for another charger for future needs. INCH Duo was chosen for its quality, durability, and user-friendly design. The station provides 2 x 22 kW charging power with two Type 2 charging sockets, allowing two vehicles to charge simultaneously. This ensures that employees and visitors can conveniently charge their vehicles during work hours or visits.
Summary
Installing EV charging stations at the workplace demonstrates the company’s commitment to sustainability, improves daily convenience, and supports the growing adoption of electric vehicles. The solution is easily expandable in the future, making it a sustainable long-term investment
Solution Details
- Charging solution for businesses: Printing house parking area
- Charging station: INCH Duo
- Features: 2 x 22 kW maximum charging power, ergonomic design, large display